waterbridge.org
Menu
  • Link IconLink IconLink Icon
  • External link opens in new tab or window
  • External link opens in new tab or window
  • External link opens in new tab or window
  • External link opens in new tab or window


WaterBridge Group of Companies

Construction and Repairs


WaterBridge Steel constructed and delivered the Adams Lake II cable ferry to the Ministry of Transportation and Infrastructure in May 2017.  The vessel was built in Nakusp, BC, and assembled on the shores of Adams Lake, BC.


https://0901.nccdn.net/4_2/000/000/038/2d3/good-photo-adams-lake-ii--002-.jpg
https://0901.nccdn.net/4_2/000/000/023/130/adams-lake-ferry-ii-june-2019-2-.jpg
https://0901.nccdn.net/4_2/000/000/072/2aa/adams-lake-ferry-ii.jpg
https://0901.nccdn.net/4_2/000/000/050/82c/adams-lake-ii-jan-2019-3-.jpg
https://0901.nccdn.net/4_2/000/000/017/e75/adams-lake-ii-jan-2019.jpg
https://0901.nccdn.net/4_2/000/000/071/260/adams-lake-ferry.jpg
0
Column

 

Column

 


WaterBridge Steel also built the MV Francois Forester (left) on Francois Lake, BC, which went into service on November 25, 2004, and the MV Columbia (right) on Upper Arrow Lake in Nakusp, BC.  The Columbia went into service in June of 2014.


The WaterBridge Steel construction team is a very skilled and hard-working group that has taken immense pride building the new Upper Arrow Lake ferry, the MV Columbia.


Contact WaterBridge Steel at 250-265-0127

Column

 


WaterBridge Group of Companies, Box 750 Nakusp, BC  V0G1R0

Phone: 250-265-0127| Email: info@waterbridgesteel.org


close lightbox